Industry: Petrochemical

YearCompanyWorkValue in INR   
13-Oct-22Nayara Energy LimitedRevamp work of FGC at Nayara Energy1,62,50,000.00
23-Aug-22RELIANCE INDUSTRIES LIMITED,JMDOverhauling of single shaft type compressor (Model: SH) at RIL Jamnagar site27,50,000.00
15-Jul-22RELIANCE INDUSTRIES LIMITED,JMDSEZ DHDS-2 & PTU unit Fabrication Jobs during shutdown Sep’221,87,37,711.00
27-Jun-22SIEMENS LTDOverhauling job of integrally geared type compressor (Model: STC GC 40-3) at SAIL Bhilai2,596,000.00
24-May-22ONGC Petro addition LimitedOverhauling Services for PES Train-1/2 Extruder Mixer Gear Reducer6,300,000.00
15-Apr-22RELIANCE INDUSTRIES LIMITED,JMDContract for rotary jobs of PP plant S/D, RIL-HMD58,07,226.00
6-Apr-22RELIANCE INDUSTRIES LIMITED,HMDContract for Rotary jobs MEG2 S/D, RIL-HMD9,77,407.00
23-Mar-22SIEMENS LTDMajor overhauling of Steam Turbine,Overhauling job of Siemens Turbo Compressor & Gas Expander at MCPI Haldia5,841,000.00
22-Mar-22ONGC Petro addition LimitedHiring of Mechanical Maintenance Services for overhauling of both PP Reactor Agitators & its accessories during Major Turn Around Shutdown1,32,30,000.00
11-Dec-2021HPCL-MITTAL ENERGY LIMITEDSTRUCTURAL WORK OF VGO -3RD REACTOR AT HMEL REFINERY SITE,BATHINDA49,577,500.00
25-Mar-2021RELIANCE INDUSTRIES LIMITEDFabrication, static, Rotary and associated scaffolding jobs at Jamnagar SEZ Complex42500000.00
25-Mar-2021RELIANCE INDUSTRIES LIMITEDFabrication, static, rotary and associated scaffolding jobs at DTA Gasification Complex13921606.41
25-Mar-2021RELIANCE INDUSTRIES LIMITEDFabrication, static, rotary and associated scaffolding jobs at SEZ Gasification complex20,882,409.61
25-Mar-2021RELIANCE INDUSTRIES LIMITEDFabrication, static, rotary and associated scaffolding jobs at C2 Full GST Plants15,237,200.00
24-Jan-2020RELIANCE INDUSTRIES LIMITEDRotary maintenance work 58,625,832.00
6-Dec-19Thyssenkrupp Industries India Pvt. Ltd.Work order (WO) for comprising of Receipt, Unloading, Stacking, Handling, Storage, Security of material at Site, onward transportation from storage yard to Erection point (Apx-2 to 3 KM depending on size and Height of consignment), Ground assemblies and Erection, Assistance for Commissioning, PG Test and Handing over of 3 X 120 TPH CFBC Boilers and its auxiliary for M/s. Haldia Petrochemicals Ltd. 159,500,000.00
30-Sep-16Reliance Industries Ltd. Vill- Nagothane, Raigad, Maharashtra. EIC- Mr. Amar Dev)OCASSIONAL FABRICATION & MAINTENANCE JOB10734000
30-Apr-16Reliance Industries Ltd. Vill- Nagothane, Raigad, Maharashtra. EIC- Mr. Amar Dev)OCCASIONAL SCAFFOLDING JOBS4800000
30-Aug-13Reliance Industries LimitedPiping related jobs carried out during shutdown19,37,596.52
8-Aug-13Reliance Industries LimitedPiping related jobs carried out during shutdown18,85,351.36
12-Jun-13Reliance Industries LimitedLevelling, Alignment & Pre-commissioning of PAC Equipments, Agitators and other rotary Equipment.12,31,690.32
12-Jun-13Reliance Industries Limited.Levelling, Alignment & Pre-commissioning of PAC Equipments, Agitators and other rotary Equipment2,19,21,732.63
23-May-13Reliance Industries LimitedReplacement of valves during shutdown91,62,958.00
14-May-13Reliance Industries LimitedRotary Equipment Maintenance job during shutdown20,55,753.73
8-May-13Reliance Industries LimitedOCCASIONAL SCAFFOLDING JOBS32,00,000.00
7-May-13Reliance Industries LimitedRotary Equipment Maintenance job during shutdown41,05,634.40
25-Apr-13Reliance Industries LimitedErection and commissioning of G301X and other Rotary Equipment37,64,060.00
25-Mar-13Reliance Industries LimitedMAINT. JOBS IN LLDPE & BUT-1 PLANTS AT RIL NAGOTHANE90,00,000.00
25-Mar-13Reliance Industries LimitedMAINT. JOBS IN LDPE PLANTS AT RIL NAGOTHANE40,00,000.00
1-Feb-13Reliance Industries LimitedOccasional Boiler Maintenance Jobs40,00,000.00
27-Aug-12Reliance Industries LimitedCoke Drum block#3 switch valve piping modification5,05,620.00
11-Aug-12Reliance Industries LimitedOccassional Rotary Equipment Maintenance Jobs1,00,00,000.00
10-Aug-12Reliance Industries LimitedOccasional Static Equipment Maitenance & Fabrication jobs and & Occasional Coke Drum Related Jobs.3,60,00,000.00
1-Aug-12Reliance Industries LimitedOccasional Jobs Related to Coke Drum and Coke Handling System2,15,00,000.00
1-Aug-12Reliance Industries LimitedOccassional Rotary Equipment Maintenance Jobs3,11,00,000.00
1-Aug-12Reliance Industries LimitedOccassional Rotary Equipment Maintenance Jobs3,00,000.00
28-Jul-12Reliance Industries LimitedOccasional Bundle Puller Jobs55,00,000.00
24-Jul-12Reliance Industries LimitedOverhauling of rotary equipments during May’2012 shutdown at VCPVC plant250,787.52
7-Jul-12Reliance Industries LimitedScaffolding job during Aromatics shutdown at Aromatics Plant22,51,605.74
3-Jul-12Reliance Industries LimitedMaintenance & Inspection of coils of steam generator 523-Y0414,04,500.00
30-Jun-12Reliance Industries LimitedRotary Equipment maintenance job at CPP, PP, Coker, Hydrogen, Sulphur, RTF, RRTF Plant5,35,91,565.00
30-Jun-12Reliance Industries LimitedOccasional Jobs Related to Coke Drum and Coke Handling System at Coker Plant2,02,84,534.00
30-Jun-12Reliance Ports & Terminal LimitedPreventive Maintenance & Overhauling of all type of Rotary Euip at RRTF Plan5,00,000.00
28-Jun-12Reliance Industries LimitedOverhauling of Agitators3,55,282.33
14-Jun-12Reliance Industries LimitedtCompressor Overhauling in PVC/VCM plant23,59,560.00
30-May-12Reliance Industries LimitedCompressor overhauling at LLDPE plant2,47,641.44
26-May-12Reliance Industries LimitedOverhauling of rotary equipments during ACN shutdown176,180.48
8-May-12Reliance Industries LimitedCombution inspection of Gas Turbine #4 at CPP Plant4,31,462.40
8-May-12Reliance Industries LimitedAdditional compensation for Feb’12 shutdown23,31,958.00
4-May-12Reliance Industries LimitedRotary Equipment maintenance job in shutdown in PE Plant11,23,600.00
16-Apr-12Reliance Industries LimitedOCCASIONAL MAINTENANCE OF ROTARY EQUIPMENTS70,14,681.00
26-Mar-12Reliance Industries LimitedIBR piping job under CP-134,19,140.00
16-Mar-12Reliance Industries LimitedCompressor Motor removal & reinstallation in MEG Plant3,30,900.00
15-Mar-12Reliance Industries LimitedOccasional IBR Co-ordination Jobs10,00,000.00
6-Mar-12Reliance Industries LimitedRotor removal & refixing of Generator_GT#32,64,720.00
6-Mar-12Reliance Industries LimitedCompressor Overhauling in MEG Plant20,95,700.01
9-Feb-12Reliance Industries LimitedCompressor Overhauling in PP Plant7,44,525.00
20-Jan-12Reliance Industries LimitedOVERHAULING OF EXTRUDER CMP250X-12AW15,44,200.00
17-Jan-12Reliance Industries LimitedNozzle modification job in 241/242-S013,63,990.00
6-Jan-12Reliance Industries LimitedExtruder overhauling at PP Plant13,23,600.00
25-Nov-11Reliance Industries LimitedCompressor Overhauling in MEG Plant26,79,573.05
12-Nov-11Reliance Industries LimitedRotary equipment o/h job.4,05,021.60
20-Oct-11Reliance Industries LimitedCombution inspection of Gas Turbine at CPP Plant3,83,844.00
12-Oct-11Reliance Industries LimitedStatic job to facilitate IBR inspection in Sulphur units 452 & 453 at Sulphur plant6,72,830.00
30-Sep-2011EPILAssembly, erection/installation, testing & mechanical completion of coke cutting system and coke crushing system with conveyer for DCU unit at EOL refinery site, Vadinar8,934,300.00
26-Sep-11EPILErection & Alignment of Steam Turbine23,052,700.00
22-Sep-11Reliance Industries LimitedCompressor Overhauling at Hydrogen Plant3,30,900.00
21-Sep-11Reliance Infrastructure Ltd.Combustion & Boroscopic Inspection2,97,000.00
9-Sep-11Reliance Industries LimitedExpander Overhauling in PTA Plant15,22,140.00
3-Sep-11Reliance Industries LimitedFin Fan Inspection & PM Job in PTA Plant6,83,860.00
3-Sep-2011EPILReplacement of impellers & modification in motor base plate of CDU/VDU/SGU/FCCU/UGS Unit during shutdown period at EOL refinery site.1,009,245.00
27-Aug-11Reliance Industries LimitedRotary & Static Equipment Maintenance job of Offshore & Onshore plant at Kakinara Site7,34,61,868.00
24-Aug-11EPILRotary Manpower deployment – Train- 1 for commissioning and Pre-commissioning activities6,442,755.36
1-Aug-11Reliance Industries LimitedMAAG pump (PRU 3-41) overhauling at HDPE-1 plant.4,36,788.00
27-Jul-11Reliance Industries LimitedRotary equipment o/h job.5,65,839.00
8-Jul-11Reliance Industries LimitedExpander Overhauling in PTA Plant16,54,500.00
2-Jul-11Reliance Industries LimitedRotary equipment o/h job.1,98,540.00
8-Jun-11Reliance Industries Limitedoverhauling of compressor GIOP-K 201 of N2O2/IOP plant4,86,423.00
10-May-11Reliance Industries LimitedMaintenance of rotory Equipment1,92,97,982.00
13-Apr-11Reliance Industries LimitedAttending surprise job during Feb’11 shutdown at FCCU Plant5,39,600.83
21-Feb-11Reliance Industries LimitedOccassional Boiler Maintenance Job at CPP Plant72,00,000.00
9-Feb-11Reliance Industries LimitedM & I of plate type exchanger at PP Plant7,72,100.00
9-Feb-11Reliance Industries LimitedCompressor Overhauling in MEG Plant29,84,497.40
7-Feb-11Reliance Industries LimitedAttending surprise job during Feb’11 shutdown at FCCU Plant17,45,773.00
21-Oct-10Haldia Petro ChemicalsRotary equipment maintenance job7,922,806.00
21-Sep-10Reliance Industries LimitedRotary equipment o/h job.91,60,873.85
15-Jul-10Reliance Industries LimitedRotary Equipment maintenance job at CPP, PP, Coker, Hydrogen, Sulphur, RTF, RRTF Plant3,47,50,000.00

Industry: Refinery

YearCompanyWorkValue in INR   
29-Jul-22RELIANCE INDUSTRIES LIMITEDRotary Manpower Services for Extruder-5101 Gear box Overhauling Job40,00,000.00
5-Jul-22RELIANCE INDUSTRIES LIMITEDRotary Equipments Overhauling Jobs during PP Line C Unit Shutdown at DTA Refinery -Jamnagar43,00,000.00
16-Dec-21RELIANCE INDUSTRIES LIMITEDCritical Rotary Equipments overhauling jobs in SEZ PP Unit Line 1 & 2 Shutdown at RIL-Jamnagar80,00,000.00
31-May-21THERMAX LIMITEDMISCELLANEOUS MECHANICAL WORK AT RIL UF+RO DTA JAMNAGAR.1,17,46,600.00
25-Jun-20RELIANCE INDUSTRIES LIMITEDFabrication, static, Rotary and associated scaffolding jobs at Jamnagar SEZ Complex10,04,60,574.08
24-Oct-19HPCL-MITTAL ENERGY LIMITEDArc Providing Static Maintenance Services at HMEL Refinery Site, Bathinda6,50,00,000.00
13-Jun-19Linde India LimitedMechanical and Civil Erection work at BORL BINA PROJECT SITE VPSA PLANT2,36,00,000.00
31-Dec-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- K C Upreti (8454843486)Erection of compressor at PCG5284639
31-Dec-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- K C Upreti (8454843486)Levelling, Alignment & pre commissioning of Rotary equipment-PCG Unit, DTA14140012
31-Dec-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- K C Upreti (8454843486)Preservation of rod mill6000000
31-Dec-16Thermax Engg. Const. Co. Ltd. Energy House, D-II Block, Plot No 38 & 39, MIDC area, Chichwad, Pune 411019 (EIC: Mr. N. Menon)Labour charges towards Unloading, Physical Verification, Preparation of Materials Receipt Report, Storing/stacking, Inplant Transportation of all erection materials, fabrication of syn gas piping, and Dismantling & Erection of items as per work description, application of refractory & insulation, finish painting, & providing assistance during Commissioning of 6 Aux boilers at M/s. Reliance Utilities & Power Pvt Ltd., Jamnagar, Gujarat.32921480
31-Dec-16Thermax Engg. Const. Co. Ltd. Energy House, D-II Block, Plot No 38 & 39, MIDC area, Chichwad, Pune 411019 (EIC: Mr. N. Menon)Labour charges towards Unloading, Physical Verification, Preparation of Materials Receipt Report, Storing/stacking, Inplant Transportation of all erection materials, fabrication of syn gas piping, and Dismantling & Erection of items as per work description, application of refractory & insulation, finish painting, & providing assistance during Commissioning of 9 HRSG boilers at M/s. Reliance Utilities & Power Pvt Ltd., DTA Area, Jamnagar, Gujarat.53595720
31-Dec-16Thermax Engg. Const. Co. Ltd. Energy House, D-II Block, Plot No 38 & 39, MIDC area, Chichwad, Pune 411019 (EIC: Mr. N. Menon)Labour charges towards Pre shutdown, shutdown & post shutdown work at our 2 X 23.90 TPH site, at M/S. Reliance Industries Limited., Jamnagar, Gujarat43029163
31-Dec-16Thermax Engg. Const. Co. Ltd. Energy House, D-II Block, Plot No 38 & 39, MIDC area, Chichwad, Pune 411019 (EIC: Mr. N. Menon)Labour charges towards assembly of 5 No. Evaporator modules each for FGC north & south Train at our 2 X 23.90 TPH FGCs at M/S. Reliance Industries Ltd., Jamnagar, Gujarat31070836
30-Sep-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- Unna Murikeyya (9998215214)OCASSIONAL FABRICATION, STATIC MAINTENANCE & COKER SPECIIFC JOBS IN SEZ43600000
30-Sep-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- R. Mohana RajanBOILER MAINTENANCE JOBS IN DTA REFINERY ON CALL BASIS4000000
30-Sep-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- Anil PahujaOCASSIONAL FABRICATION, STATIC MAINTENANCE & COKER SPECIIFC JOBS IN DTA REFINERY29500000
31-Aug-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- K C Upreti (8454843486)Equipment preservation job in DTA Area11113353
31-Aug-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- K C Upreti (8454843486)Equipment preservation job in SEZ Area1559050
31-Aug-16Thermax Engg. Const. Co. Ltd. Energy House, D-II Block, Plot No 38 & 39, MIDC area, Chichwad, Pune 411019 (EIC: Mr. N. Menon)Labour charges towards Unloading, Physical Verification, Preparation of Materials Receipt Report, Storing/stacking, Inplant Transportation of all erection materials and erection & providing assistance during Commissioning 1 No. 275 TPH, 112.8 kg/cm2, 512 +/- 5 deg. C. HRSG Boiler at M/s. Reliance Utilities & Power Pvt Ltd., Jamnagar, Gujarat.51325640
31-Aug-16Thermax Engg. Const. Co. Ltd. Energy House, D-II Block, Plot No 38 & 39, MIDC area, Chichwad, Pune 411019 (EIC: Mr. N. Menon)Labour charges towards unloading, physical verification, storing/stacking, inplant transportation of all project materials and erection & providing assistance during commissioning of 1 no. 9.44 MMK/Cal/Hr Hot oil heater at RIL, Jamnagar, Gujarat.8052917
31-Jul-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- K C Upreti (8454843486)Levelling & Alignment of Rotary equipment-ROGC & MEG Unit, C2 complex, DTA11969463
31-Jul-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. (Refinary Complex)Occasional rotary equipments maintenance jobs on call basis15400000
31-Jul-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- HOD of each unit.Occassional Rotary Equipment Maintenance Jobs39400000
30-Jun-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- K C Upreti (8454843486)Equipment preservation job in DTA Area11821420
30-Jun-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- K C Upreti (8454843486)Equipment preservation job in SEZ Area8221663
30-May-16Reliance Industries Ltd. Vill- Meghpar, Padana, Jamnagar. EIC- K C Upreti (8454843486)Installation, Levelling, Alignment & pre commissioning activities of Rotary equipment-PX4 Projects21848424
1-May-13HPCL-Mittal Energy LimitedRotary Equipment Maintenance job1,68,54,000.00
15-Apr-13Indian Oil Corporation LimitedProviding manpower and technical services for Major overhauling and testing of GT-3 generator at Mathura11,68,544.00
8-Apr-13HPCL-Mittal Energy LimitedStatic Equipment Maintenance job2,00,00,000.00
4-Feb-13Essar Oil LimitedOccasional Coke Drum Specific PM jobs & Static Equipment Maintenance job67,12,924.00
21-Jan-13Indian Oil Corporation LimitedLining up of agency for carrying out ARC jobs (Hot & Cold) for Process units of PNC”.2,51,07,520.10
28-Jul-12Reliance Petroleum LimitedOccasional Bundle Puller Jobs35,00,000.00
30-Jun-12Reliance Petroleum LimitedOccasional Coke Drum Specific PM jobs & Static Equipment Maintenance job at Coker Plant3,89,31,184.00
20-May-12HPCL-Mittal Energy LimitedPre-commissioning and commissioning including chemical cleaning and passivation work for Guru Gobind Singh Refinery Project- Bathinda23,20,00,000.00
26-Mar-12Reliance Petroleum LimitedDelta valve replacement done at Coker Plant30,12,400.00
14-Mar-12Essar Oil LimitedOccassional Rotary Equipment Maintenance Jobs3,90,00,000.00
2-Mar-12Essar Oil LimitedOccasional Coke Drum Specific PM jobs & Static Equipment Maintenance job92,00,000.00
20-Feb-12HPCL-Mittal Energy LimitedBearing replacement of ID/FD Fan3,62,536.00
23-Jan-12Reliance Petroleum LimitedIBR piping job_HMU16,30,000.00
21-Jan-12HPCL-Mittal Energy LimitedManpower services for insulation work20,00,000.00
12-Jan-12HPCL-Mittal Energy LimitedPre-commissioning & Commissioning26,06,75,200.00
4-Jan-12Essar Oil LimitedRotary Manpower deployment – Train- 1 for commissioning and Pre-commissioning activities35,07,540.00
23-Dec-11Essar Oil LimitedSIPL SEP 2011 S/D WORK25,77,523.46
22-Dec-11HPCL-Mittal Energy LimitedManpower services for Pre-commissioning & Commissioning & start upactivity20,00,000.00
22-Dec-11HPCL-Mittal Energy LimitedManpower services for insulation work20,00,000.00
19-Dec-11Essar Oil LimitedSep’11 SD CCR RGC 30K00117,64,800.00
29-Oct-11Bharat Oman Refineries LimitedStatic Equipment Maintenance Job3,46,78,320.00
10-Oct-11HPCL-Mittal Energy LimitedExecution of LPG unloading facility in offsite17,64,806.00
4-Oct-11Reliance Petroleum LimitedAdditional Compensation job done under maintenance ARC at Coker Plant61,407.00
1-Sep-11Indian Oil Corporation LimitedEmergency /Planned Maintenance Jobs of GT I,II,III,IV & V at Gujarat Refinery3,99,000.00
27-Aug-11Reliance Petroleum LimitedHydrotest of the Process Hoses at CES2,85,860.00
25-Aug-11HPCL-Mittal Energy LimitedRotary Equipment Maintenance job2,00,00,000.00
19-Aug-11HPCL-Mittal Energy LimitedCleaning of column at MS Block unit60,66,500.00
30-Jul-11Reliance Petroleum LimitedCompressor Overhauling at Aromatics Plant3,25,000.00
24-Jun-11Indian Oil Corporation LimitedInspection & Replacement of Bearing of Gas Turbine generator, GTG – 1 at MR.3,60,000.00
14-Jun-11Essar Oil LimitedRotary Manpower deployment – Train- 1 for commissioning and Pre-commissioning activities64,42,755.36
27-May-11Bharat Oman Refineries LimitedStatic Equipment Maintenance Job49,44,891.00
13-May-11HPCL-Mittal Energy LimitedCleaning of column at VGO and DHDT unit1,15,08,702.00
6-May-11Essar Oil LimitedDeployment of manpower & resources for fabrication & Static Jobs in VPCL for expansion activity8,13,765.83
3-May-11HPCL-Mittal Energy LimitedHydrotesting of pipe loops3,75,02,000.00
30-Apr-11Bharat Oman Refineries LimitedStatic Equipment Maintenance Job4,09,95,026.00
15-Apr-11Essar Oil LimitedCompressor overhauling during major shutdow in 201123,16,300.00
12-Mar-11Reliance Petroleum LimitedIBR liasioning for exchangers, welding of skin thermocouple in heater # 4 and compensation for september at Coker Plant3,52,695.00
2-Feb-11Reliance Petroleum LimitedOccasional Coke Drum Specific PM jobs at Coker Plant12,82,300.00
2-Nov-10Indian Oil Corporation LimitedGenerator Overhauling testing & cryogeniccleaning of steam27,36,000.00
25-Oct-10HPCL-Mittal Energy LimitedPre Commissioning & Commissioning2,14,33,516.00
4-Jan-10Indian Oil Corporation LimitedSupport Service for Rotary equipment, Electrical equipment, instrumentation equipment maintenance in BXP Units at Barauni Refinery1,51,20,000.00
7-Oct-09Bharat Oman Refineries LimitedRotary Equipment maintenance job.1,67,15,725.00

Industry: Refinery

YearCompanyWorkValue in INR   
20-Sep-21Gujarat State Electricity Corporation LimitedOverhauling of the H.P Turbine cylinder in LMW / LMZ design BHEL makes 200 MW Unit No 3 at GSECL Ukai TPS.39,15,000.00
14-Sep-21Gujarat State Electricity Corporation Limited4X125MW Surat Lignite Power Plant; Biennial Maintenance contract of Unit 1 to 4 Turbine & its auxiliaries and balance of plant equipment for the period of two years (2021-23) 2,06,12,654.75
25-Mar-21JAMNAGAR UTILITIES & POWER PVT LIMITEDFabrication, static, rotary and associated scaffolding jobs at JMD SEZ1,50,00,000.00
25-Mar-21JAMNAGAR UTILITIES & POWER PVT LIMITEDFabrication, static, rotary and associated scaffolding jobs at C2 CPP Complex72,43,800.00
3-Nov-20BGGTS Private LimitedFuel conversion project- Offbase and Onbase -2 Units along with required no. of manpower and tools97,56,402.00
20-Jun-20NTPC Limited Biennial Maintenance Contract for Gas Turbine & Auxiliaries at Dadri Gas Power Station (2020-22)1,24,71,621.91
27-Nov-19NEEPCO Limited Assistance in work for carrying out operation and maintenance of 65.42 mw gas turbine and 35.58 MW steam turbine along with various related field activities of TGBPP at MONARCHAK2,23,21,912.00
13-Sep-19BHELErection, Testing, commissioning Trial run, PGTR and handing over of 1X59.3 MW GTG, 1X 15.5 MW STG, Deaerator system, 11KV Emergency DG Sets, HP and LP Pumps, Fire Fighting system, Associated static and rotating auxiliaries of GTG and STG etc. at 1X75 MW VISAKH REFINERY MODERNIZATION PROJECT (VRMP), Visakhapatnam, Andhra Pradesh 5,94,00,000.00
9-Aug-19K C  Cottrell India Private LimitedMechanical  Erection activities for renovation and modernisation for ESP Unit 1,2,3 of 210 MW  WBPDCL , Kolaghta 14,53,92,562.00
1-Apr-19NTPC Limited Biennial Contract for Mechanical Maintenance at NTPC Anta2,01,60,792.89
9-Aug-18K C  Cottrell India Private Limited  Electrical Erection activities for renovation and modernisation for ESP Unit 1,2,3 of 210 MW  WBPDCL , Kolaghta 1,47,31,436.00
9-Aug-17K C  Cottrell India Private LimitedCivil Erection activities for renovation and modernisation for ESP Unit 1,2,3 of 210 MW  WBPDCL , Kolaghta 9,04,72,650.00
25-Apr-12Reliance Utilities Private LimitedBearing inspection for the purpose of grooving on bearing housing cover2,00,000.00
17-Feb-11Reliance Utilities Private LimitedOccassional Boiler Maintenance Job at CPP Plant72,00,000.00
30-Jun-07Govt. of Arunachal PradeshRenovation and modication of Hydro power plant1,68,12,900.00
30-Jun-07Govt. of Arunachal PradeshErection & commissioning of hydro power plant1,43,10,000.00

Industry: Fertilizer

YearCompanyWorkValue in INR   
29-Aug-21Matix Fertilizers and Chemicals LimitedPMS (Plant Maintenance Services) Mechanical & Electrical 2,19,07,13,070.00
27-Jun-19Matix Fertilizers and Chemicals LimitedServices Required for IPM4,02,37,870.00

Industry: Steel Plant

YearCompanyWorkValue in INR   
13-Jan-20Thermax Babcock & Wilcox Energy Solutions Pvt. LtdLabour charges for Unloading, Physical Verification, Preparation of MRR, Storage, in plant Transportation of all erection materials and Erection & providing assistance during Commissioning including trial run, PAC & FAC of 1 X 175 MW TG sets along with accessories, as per BOQ sent, for our BFG based Power Plant M/s JSW Steels Ltd; Dolvi. 2,30,10,000.00
01-Oct-14Bhilai Engineering Corporation LimitedErection & providing ssistance in Commissioning of 4 x 25 TPH West Heat Recovery Boiler at COB #11 at Bhilai Steel Plant, Bhilai, CH.3,11,00,000.00
01-Dec-13Bhilai Engineering Corporation LimitedErection & providing assistance in Commissioning of 4 x 25 TPH West Heat Recovery Boiler for “ISP CDCP # 11 project, at IISCO Steel Plant, Burnpur, West Bengal3,12,00,000.00
30-Jun-12Thermax Engineering Construction Company Ltd.Erection, assistance during commissioning of 1 x42.3 TPH , WHRB Boiler at M/s.Super Smelter Ltd., Jamuria , West Bengal,73,00,000.00
30-Jun-12Thermax Engineering Construction Company Ltd.Erection and providing assistance during commissioning of 1 x 24 TPH , 67 Kg/cm2, 490 +/- 5 Deg. C, AFBC Boiler at Seven Star Steels Ltd, Jharsuguda, Orissa.55,00,000.00
30-Sep-11Thermax Engineering Construction Company Ltd.Erection, assistance during commissioning of 1 x115TPH, 91 kg/cm2, 525 Deg. C AFBC Boiler at M/s. Ankit Metal & Power Ltd, Bankura.1,66,95,886.00
30-Jun-11Thermax Engineering Construction Company Ltd.Erection, testing and commissioning of mechanical package-1 for 1 x 20 MW CPP at KJS, Barbil, Orissa1,51,27,500.00
31-Jul-10TECHNO ELECTRIC AND ENGG. CO. LTD. \Erection, fabrication , assembly of WHRB (CBBT-631) of capacity 49.3 TPH & 69 kg/cm2 at M/s. Techno Electric & Engineering Co Ltd site, Makarampur, Kharagpur, West Bengal1,25,00,000.00
30-Jun-10Thermax Engineering Construction Company Ltd.Erection, assistance during commissioning of 1 x 35 TPH x 70 Kg/cm2,x490 Deg. C., AFBC Boiler & 1 x 41.5 TPH x 69 Kg/cm2 x 490Deg. C. WHRB Boiler at M/s. Super Smelter Ltd., Jamuria, West Bengal,1,10,00,000.00
07-Oct-09Thermax Engineering Construction Company Ltd.Erection, assistance during commissioning of 1 x 35 TPH, 66 Kg/cm2, 495 Deg. C., Bi-Drum AFBC Boiler at Drolia Electrosteel Ltd, Raipur Odisa61,29,768.08
30-Jun-07Thermax Engineering Construction Company Ltd.Erection, assistance during commissioning of 1 x 50 TPH, 51 Kg/cm2, 405 Deg. C., Bi-Drum AFBC Boiler at JSL Ltd, Jajpur, Orissa,1,10,48,135.00

Industry: Paper

YearCompanyWorkValue in INR   
30-Jun-12Thermax Engineering Construction Company Ltd.Erection, testing and commissioning of 1 x 165 TPH CFBC Boiler for the 1 x 25+ 1 x30MWCPP at J K Papers Ltd, Rayagada, Orissa2,44,20,000.00