Renovation and Modernization(dismantling and installation of TG set with Deck Modification) of unit#5(210MW) at Bandel thermal power station at west Bengal thermal power corporation limited
Erection, Testing & Commissioning for 2×350 MW STG Package including Auxiliaries like BFP, DE-aerator, Drive Turbine etc including Lube Oil Piping at Ind-Barath project at Sahajbahal village
Erection, Testing and commissioning of Gas Turbine and balance of Plant / Power Cycle for our 225 MW Gas Based CCPP at Kashipur, Udham Singh Nagar District, Uttrakhand
Installation of 290 MW Steam Turbine, Generator and associated equipment’s of Unit # 2 Condenser # 2 including reassembled skids, interconnecting piping, valves, fittings, pumps, expansion joints, Condenser and other related equipments includes handling, setting, assembly, alignment, coupling and erection of equipment’s at Dabhol Power project, Maharashtra.
Erection, Testing & Commissioning of W.German-KWU-design : 2 X 210 MW Turbine, Generator Feed, Pumps, Condenser, Rotating & Static Auxiliaries & Associated HP & LP Piping Unit-I, II & V at Wanakbori TPS
Erection, Alignment, Testing & Commissioning of Russian Design: 3 x 210 MW Turbine, Generator, Exciter Feed Pumps, Condenser, Auxiliaries and associated piping Turbine boxed up at Kolaghat TPS.
(British design : 3 X 120 MW) Turbine Generator, Piping, HV, LV Bus duct, Control and Power Cables.( E.S.P. for one set only ) Major Modification conveyor done by site fabrication High pressure welding & S.R.done by own staff at Santaldih TPS.
Erection, Testing & Commissioning of Czek design: 2 X 110 MW Turbine, Generator, Condenser Auxiliaries and Piping at Patratu TPS.
Erection, Testing & Commissioning of Condenser, Turbine, Generator, Exciter, Auxiliaries and Piping for 1 x 60 MWTG set, Unit II at Bongaigaon Thermal Power Station, Salakati, Assam
Erection, Testing and commissioning and 3 x 34 MWTG sets at DESU /WHRP
Erection, Testing, Pre-Commissioning & Commissioning of 1 x 33 MW Steam Turbo-Generator sets Turbine, Generator, Condenser, Pumps, Ejector, Lube Oil Tank, Cooler, Boiler Feed Water Pump, Generator cooler, Valve, Piping including Thermal Insulation at M/s HEG, Mandideep in Madhya Pradesh
Erection, Testing & Commisisoning of 25 MW Chinese made Steam Turbine at Jindal Strips Ltd., Raigarh
Erection, Testing & Commissioning of 21 MW TG unit (Toyo Denki make) with auxiliaries & piping Turbine & Generator at Century pulp & Paper, Lalkua
Erection, testing, commissioning of surface condensers, steam turbines, turbo blowers, pumps & auxiliaries including condensate extraction pumps, including Electrical and Control & Instrumentation equipments, piping, application of thermal insulation, final painting, assistance for PG Test etc and handing over of 3 x 18 MW Turbo Blower set at Steel Authority of India Ltd (SAIL), Rourkela Steel Plant, Rourkela, Dist. Sundergarh (Orissa)
Erection, Testing & commissioning of Turbine, Generator & Exciter, Auxiliaries and piping for 3 x 16 MW unit of Bongaigaon Refinery Project.
Erection &Commissioning of STG (1 x 6 MW) Triveni steel at Monet Ispat— Raipur
Few Erection, Testing & Commissioning jobs of Gas Turbine & Generator
Erection, Testing & Commissioning of FR-6 Gas Turbine-Generator sets & their Aux., BOP with related Piping etc for 2 x 30 MW EPCC Package-7 (GTG&HRSG) at IOCL, Gujarat Refinery, Jawaharnagar, Vadodara.
Erection and Commissioning job of GT# 7 at RIL Hazira
Erection and commissioning of both GT-IV & V (M/s BHEL supplied Frame-VI Gas Turbines) at IOCL Gujarat Refinery
Erection, Testing & Commissioning together with material handling of 1 x 21 MW GTG (Frame-V GT) with auxiliaries & piping etc for 1 x 21 MW GTG based co-generation Captive Power Plant of BRPL-DHDT project at Bongaigaon Refinery & Petrochemicals Limited
Erection of 3 x 32 MW Nuovo Pignone (Italy) make Gas Turbine Generator and auxiliaries and piping in CPP plant at Reliance Jam nagar
Erection of 2 x 22.5 MW Westing House Gas Turbine (Combined Cycle) at Namrup Thermal Power Station.
Erection & Commissioning of Gas Turbine Generator Frame-V and Borsig Compressor at Indian Farmers Fertilizers Corporation Limited (IFFCO)Aonla.
Erection & Commissioning of Frame V Gas Turbine and Generator at National Fertilizers Limited (NFL), Vijaipur
Erection of Frame VI Gas Turbine, Load Gearbox accessory gear box at Rajasthan State Electricity Board, Jaisalmer
Erection / Installation, testing & commissioning including Material Handling, Electrical and C&I Job etc. of 1 X 21 MW GTG (Frame-V) with all accessories at GOTTSECL, Baramura, Tripura.
Erection of 3 x 32 MW Nuovo Pignone (Italy) make Gas Turbine Generator and auxiliaries and piping in CPP plant at Reliance Jamnagar.